Live in Minnesota · 80% EVV threshold in effect since July 1 · See what it means

MN 245D Fire Drill Compliance — Quarterly Drill Log Requirements

Quarterly fire drills are one of the most commonly cited gaps in a Minnesota 245D survey — not because the rule is complicated, but because the documentation quietly falls behind. Here's exactly what's required, what surveyors check, and the four fields agencies forget most.

New to Minnesota compliance? Start with the Minnesota overview — 245D, 144G, CFSS and EVV in one place.

Compliance · Minnesota 245D · 2026

What 245D requires

If you operate a licensed 245D community residential setting (group home, foster care, or similar HCBS residential service) in Minnesota, you're required to run and document a fire drill on every shift, every quarter — at minimum. Most agencies running three shifts (day, evening, night) need at least 3 drills a quarter, 12 a year, and many run more to account for weekend staffing patterns that differ from weekdays.

This sits on top of a broader emergency-preparedness duty: Minn. Stat. § 245D.06 requires a written emergency plan and staff trained on it. The fire drill log is the evidence that the plan isn't just a document in a binder — it's something your staff can actually execute.

The exact rule

Two authorities apply, and a surveyor or fire marshal review checks against both:

Drills must be conducted on each shift under varying conditions; safe-weather and severe-weather drills must also be conducted annually. — Minn. R. 9555.5605

Always verify current requirements with your local Fire Marshal — state fire code adoption and local enforcement can vary.

What surveyors look for

In practice, a 245D fire-drill review isn't just "did you run 4 drills this year." Surveyors and fire marshals are checking a fuller picture:

Common citations & how to avoid them

The 4 fields most agencies forget

Even agencies that run every drill on schedule often lose points on documentation completeness. These four fields are the ones that quietly go missing:

A quarterly drill log template

If you're tracking this on paper or in a spreadsheet, build your log with a column for every field above — drill type, date, time, house, shift, staff conducting, staff count, evacuation time, notification method, occupants evacuated, alarm signal verified, and simulated conditions — plus a deficiencies/corrective-action column. That's the full set a 245D review will actually check.

Want the fillable version instead of building it from scratch? Book a 20-minute demo and we'll walk through the exact drill log Sothcare group-home customers use today.

How Sothcare handles this in one click

Sothcare's Fire Drills module is built around exactly this field set — including the state-specific regulation text for MN 245D, MN 144G, WI DHS 83/88, and ME 10-144 CMR, so your staff sees the right citation for your license type automatically. Every quarter's compliance status (met / at-risk / missed, per house) is visible on one screen, and the full log — including notification method, occupants evacuated, alarm signal verification, and simulated conditions — exports in one click for a survey.

This guide is general educational information, not legal advice. Always confirm current requirements against Minn. R. 9555.5605, Minn. R. Ch. 7511, and your local Fire Marshal — rule numbers and local enforcement can change.

FAQ

How many fire drills does a 245D home need per quarter?

At minimum, one drill per shift per quarter — so if a home runs three shifts, that's 3 drills every quarter, 12 per year. Many agencies run more than the minimum to cover weekend and overnight staffing patterns realistically.

Do 245D drills need to be unannounced?

The rule requires drills under varying conditions, which is generally read to include unannounced drills and different simulated scenarios (blocked exit, nighttime, etc.) rather than the same scripted drill every quarter.

What's the difference between Minn. R. 9555.5605 and the Minnesota State Fire Code?

Minn. R. 9555.5605 sets the community-residential licensing requirement for drill frequency and conditions. Minn. R. Ch. 7511 adopts the Minnesota State Fire Code, which governs facility-wide fire-safety planning (alarm systems, egress, extinguishers). Both apply, and DHS/fire marshal reviews check against both.

Do safe-weather and severe-weather drills count toward the quarterly requirement?

No — safe-weather and severe-weather drills are a separate annual requirement layered on top of the quarterly fire drill schedule, not a substitute for it.

What happens if we miss a quarter?

A missed quarter is a common, citable gap in a 245D survey. There's no retroactive fix — the best mitigation is documenting the gap, the corrective action taken, and running the drill as soon as possible, then keeping pace going forward.

See the Fire Drills module live

A 20-minute, founder-led demo — state-specific regulation text, one-click survey export, all included.

Book my 20-min demo

More: Group Home & AFC Software · Sothcare vs Therap · All resources

Last reviewed: July 23, 2026 by the Sothcare team.